Report No.

3405

Discipline/Origin

Drilling
Own Experience

Well

Fat Canyon
PL937

Date created

2021/10/02
1527 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Cement
Positive

Borgland Dolphin


What happened in Top hole:
A 30 m3 viscous freshwater spacer was pumped ahead of the cement to avoid contamination from sea water.
Firm cement was tagged approximately 3 m inside conductor, some 2 m deeper than theoretically calculated.

What Was Planned

30″ conductor cement job was planned and performed successfully without innerstring, using Tuned Light cement.
The method has been used before, by estimating the volumes, but that has usually been done with regular G-cement. On Fat Canyon it was done using Tuned Light cement.

What Was Learned

This method for cementing conductor can be used also with Tuned Light cement.

What Actions Are Required

Always keep vigilance on volume calculations for such cement job.